Transfer Request for Electric Service

Profile of the Procedure (Associated with the 8220 Law)

General features.

Description of the procedure:

This procedure is carried out in those cases in which two clients by mutual agreement decide to transfer the service of the first in the name of the second, the second will assume all the conditions in which the service is at the moment of generating the request.

This procedure can be done:

- In Branches, Agency and Modules of the CNFL.
- Sending an email to This e-mail address is being protected from spambots. You need JavaScript enabled to view it. For this purpose 10 business days are available according to the Law 9097 of Regulation of the Right of Petition, Article 6, for resolution once the complete requirements have been presented. Once managed, you must present the original documents and application signature at any of our service centers.

Binding Documents:

- Standard "AR-NT-SUCOM" Supervision of the commercialization of electricity supply in low and medium voltage "

Other provisions:

- Costa Rican Electrical Code for the Safety of Life and Property.

- Table of Annual Percentages of Depreciation of the Directorate General of Direct Taxation, of the Ministry of Finance.

Term of resolution:

8 business days once the technical requirements have been met.

Cost of the procedure:

It is calculated according to the tariff defined by the ARESEP

General considerations:

Any capable person may request services and perform procedures on behalf of the applicant, client or user, by means of an authorization granted in accordance with article 283, of the General Law of Public Administration or special power, general or generalissimo.
The institution will keep the original of the authorization, the special power and the certifications of the general and general powers, will deliver a copy of the authorization and the special power to the authorized or special attorney, as appropriate and indicate which acts have been executed.
In the same way, you can contact our free call center 800-ENERGIA (800-3637442) or through the chat center where our executives will be assisting you.

go back up

Administrative Requirements

Gazette No. 157, 18 of August 2014

In accordance with the Law 8990 of the 27 / 09 / 2011, which modifies the Law N ° 8220 "Protection of the citizen from the excess of requirements and administrative procedures", as established in his article 4, proceeds to publish the update of the requirements for the procedures related to the electric power supply service, provided by the Compañía Nacional de Fuerza y Luz, SA (CNFL) Description of requirements for Electric Services that apply to sectors of public roads in which the CNFL has electro-energy availability:

- We remind you that you must abide by the new electrical code contemplated in Decree No. 36979-MEIC.

- Regulations for the Officialization of the Costa Rican Electrical Code for the Safety of Life and Property.

General requirements.

A.1. For natural person:

- Original identity card for nationals, if they are foreigners must present documents proving their stay in the country, either: residence card, temporary permit for filing, refugee card, resident pensioner card or rentier resident card, territorial asylee card.

A.2 For legal entity:

- Original legal status (not greater than one month issued).

- Original identity card of legal representative, if they are foreigners must present documents proving their permanence in the country, either: residence card, temporary permit of filing, refugee card, resident pensioner card or rentier resident , territorial asylee card.

References:

- Telephone number, exact address by province, canton and district, email, post office box of the person requesting the service or in case of companies the qualities of this, including their legal identity card.

- Pay the security deposit approved by the Public Services Regulatory Authority corresponding to the service requested, it is done when being attended at a window.

- Location, contract number or service meter number.

- In the case of new single-phase and three-phase services, provide location number of contract or service meter number of the nearest neighbor

- Copy of identification card and authorization letter for those who apply to process (in case of not being the subscriber of the service that is presented to perform the procedure or if it is a representative of the company)

- Up-to-date service (except in the case of new single-phase and three-phase services)

- Signing of application and / or corresponding acceptance contracts (in our agencies)

Specific requirements.

- Provide the location and / or meter number of the electrical service available on site.

- Both clients must express in writing their willingness to have the service transferred in its entirety to the new user of the service.

- Sign application and respective contracts (Handwritten signature or digital signature).

go back up

Technical requirements

Visit the following link: National Technical Regulation ARESEP

Remember to hire the Engineer of your confidence to advise you adequately with the fulfillment of these requirements.

Related content

CURRENT RATES

Trade and Services Rate

Applies to: booths, recreation areas, motels, hotels, shops, workshops, combined house store services, etc.


Industrial Rate

Medium Voltage Rate

Applies for: customers served in medium voltage with a minimum validity of one year.


Preferential rate

Applies for: pumping of drinking water, education, religion, protection of childhood and old age, people with home ventilatory support.

Complete Current fare system: Click here

Download Documentation in PDF: Click here

go back up

Contact Information

  • Address:

    5 Avenue, 1 and 0 Street, Central Offices, San José, Costa Rica

  • Phone:

    (506) 2295-5000 / Monday to Friday from 7 am to 6 pm

  • Ext:

    10026-1000 San José, Costa Rica