Heredia, Belén, Asunción and Calle Russia (partial)

belen_17-11-2020
Zone
Construction of Lines
Date
Tuesday, November 17, 2020 08:00 - 15:30
Meeting place
Heredia, Belén, Asunción and Calle Russia (partial)
Phone
800-3637442
E-mail
This e-mail address is being protected from spambots. You need JavaScript enabled to view it.

Tuesday 17 of November 2020

Relocation of poles

From 8: 00am to 3: 30pm

Sector comprising:
La Asunción: From the entrance to Dos Pinos Gallito to the north to the Costa Rican Tabacalera facilities.
From the entrance to Dos Pinos Gallito east to the Firestone tunnel.
Russia Street: From the east exit of the Firestone tunnel to the south on Russia Street until the entrance to Las Hadas Urbanization
From the east exit of the Firestone Tunnel north up to 300 meters.
From the east exit of the Firestone Tunnel east up to 150 meters.
Sites of reference of the area that includes the interruption:
Dos Pinos Gallito Plant Belén.
Costa Rican tobacco company.
Delta gas station.
Iron Industries.
Tele Cable Wineries.
Reference sites that are not included in the interruption area:
Dos Pinos Plant Drinks Belén.
Firestone.
Costa Rica Brewery.
Modern Plastics.
Femsa.
Number of affected customers:141
Note: "Electricity service users located in areas close to the affected sector could experience slight disturbances or momentary power outages."

 

 
 

Developed by iCagenda

 

 

Categories Electric Service Suspension

Electric Service Suspensions

Mon Mar Wed Thu Fri Sat Sun
1
2
3
4
5
6
7
8
9
23
24

Contact Information

  • Address:

    5 Avenue, 1 and 0 Street, Central Offices, San José, Costa Rica

  • Telephone:

    (506) 2295-5000 / Monday to Friday from 7 am to 6 pm

  • Ext:

    10026-1000 San José, Costa Rica

CNFL Social NetworksFacebook twitter Instagram Youtube

CNFL - All Rights Reserved © 2021

Search